- IMG 6680
- IMG 6682
- IMG 6683
an amazing mushroom and leek (and cheese) tart - IMG 6685
- IMG_6687.jpg
the Boone ladies at Delia's bachelorette weekend - IMG_6693.jpg
chatting - IMG_6702.jpg
lounging - IMG_6704.jpg
more chatting - IMG_6705.jpg
Dorothy sets up at the nail salon. - IMG_6706.jpg
Delia enjoys her champagne and festive hat. - IMG_6708.jpg
a shocking manicure - 06_laser_template.JPG
On a second trip to the Sawdust Shop, we use the laser cutter to make a template for routing out some MDF at the joystick mounts. - 07_bryan_routes_joysticks.JPG
Bryan uses the template to route out an extra 3/8" of material so the joysticks will extend higher from the top of the panel. - 08_drill_for_MB_mount.JPG
We drill holes for the machine bolts that will hold the motherboard in place. - 09_mb_mount_test.JPG
Hey look, we drilled the holes in the right place! - 10_glue_prepare.JPG
The lower box pieces aligned for gluing. - IMG_6714.jpg
Chaney's amazing hat creation - IMG_6717.jpg
hot camo lingerie - 11_glue_clamped.JPG
The box, glued and clamped. - 12_button_install.JPG
Back at home, we start to assemble the top panel. We use two buttons to align the poster, then trim it around the edges. - 13_ultimarc_mount.JPG
Bryan drills holes to mount the Ultimarc keyboard encoder. - 14_doug_solders_buttons.JPG
Doug solders the ground loop with the help of Negra Modelo. - 15_finished_soldering.JPG
The finished wiring job. Doug does gorgeous work. - 16_wire_closeup.JPG